EasyManuals Logo

ABB HVC 200 User Manual

ABB HVC 200
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
3.5 Power allocation strategies
The EVSE can be configured to operate with different power allocation strategies.
The configuration of the EVSE allows for these power allocation strategies:
Power allocation strategy Available for EVSE models Reference
Static All models Section 3.5.1
Dynamic Models with more than
one device installed at the
outlets
Section 3.5.2
3.5.1 Static allocation
50%
50%
25%
25%
25%
25%
1 2
3 4
1 2
If there are two outlets, each EV receives 50 percent of the available power of the
EVSE.
If there are four outlets, each EV receives 25 percent of the available power of the
EVSE.
3.5.2 Dynamic allocation
Note: Dynamic allocation is currently not available. The equipment is
prepared with a switch matrix for dynamic charging. The matrix can
be upgraded through a software update when this feature becomes
available.
Description
28 HVC 200/300/360-EN | 002

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HVC 200 and is the answer not in the manual?

ABB HVC 200 Specifications

General IconGeneral
BrandABB
ModelHVC 200
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals