EasyManuals Logo

ABB HVC 200 User Manual

ABB HVC 200
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
6.3.17 Connect a wire that has a ferrule
Preliminary requirements
Procedure
1. Loosen the screw of the connection on
the terminal.
2. Install the ferrule in the connection of
the terminal.
3. Tighten the screw to the correct
torque. For the specifications, refer to
section 12.4.
4. Make sure that unused wires are
protected and cannot touch metal
parts.
6.4 Precommissioning mode
6.4.1 General information
You can only start the commissioning of the power cabinet when there is
a 3phase480VAC power supply from the AC power grid. If there is no
3phase480VAC power supply from the AC power grid, you can set the power
cabinet in precommissioning mode to prevent condensation.
The precommissioning mode only works correctly when the Neutral wire after
the transformer is not earthed. If the Neutral wire is earthed, then contact the
manufacturer. Refer to section 1.11.
Installation
HVC 200/300/360-EN | 002 57

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HVC 200 and is the answer not in the manual?

ABB HVC 200 Specifications

General IconGeneral
BrandABB
ModelHVC 200
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals