EasyManuals Logo
Home>Cisco>Network Router>ASR 5000 Series

Cisco ASR 5000 Series Installation Guide

Cisco ASR 5000 Series
317 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #293 background imageLoading...
Page #293 background image
Preparing a Full-Height Line Card Slot
Remove Blanking Panels â–€
ASR 5000 Installation Guide â–„
293
Remove Blanking Panels
You must remove the half-height blanking panels covering the upper and lower chassis slots, if installed.
Step 1 Identify the chassis slots in which the full-height line card will be installed.
Step 2 Use a Phillips #2 screwdriver to loosen the screws at the top and bottom of the blanking panel. Hold the screws on the
blanking panel, and pull the blanking panel away from the chassis to expose the chassis slot.
Step 3 Repeat step 2 to remove the half-height blanking panel covering the chassis slot directly below the slot exposed in the
previous step.
Caution: On a powered up chassis, do not leave chassis slots uncovered for extended periods of time. This
reduces airflow through the chassis, which could cause it to overheat. Install a card or a blanking panel s in every
chassis slot.

Table of Contents

Other manuals for Cisco ASR 5000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ASR 5000 Series and is the answer not in the manual?

Cisco ASR 5000 Series Specifications

General IconGeneral
BrandCisco
ModelASR 5000 Series
CategoryNetwork Router
LanguageEnglish

Related product manuals