43
Installation and Operation Manual for RPI M6A M8A M10A inverters V1.0 2016-02-03
6 Installation
When you connect multiple inverters, than wire RS485 on
all inverters except the last one as follows and switch the
RS485 termination resistor OFF.
5. Place and screw on the cover.
6. Place the sealing and screw on the cable gland.
When you have connected two cables, the nal situation
should look like this.