8 Settings
Installation and Operation Manual for RPI M6A M8A M10A inverters V1.0 2016-02-03
88
8.15 P(V)
Overview
Values have been set based upon country standards. If you modify these values, you will lose certication. Therefore
you should set this function only when requested by country regulations, authorities or your grid operator.
With this function you can adjust the active power as a function of the grid voltage.
Accessing the menu
Main menu > Active/Reactive Pwr > Active Power Ctrl > P(V)
E-Today: 0kWh
Power: 0W
Status: On Grid
10.Sep 2014 15:32
1. When the default information is displayed, press any button to open the main menu. Oth-
erwise, repeatedly press the button
ESC
until the main menu is displayed.
General Settings
Install Settings
2. Use the buttons and to select Active/Reactive Pwr.
To conrm your selection, press the button
ENT
.
energy production
Adj. would effect
3. The menu is protected by password 5555. Use the buttons and to set each digit.
To conrm a digit, press the button
ENT
.
Reactive Power Ctrl
Active Power Ctrl
4. Use the buttons and to select Active Power Ctrl.
To conrm your selection, press the button
ENT
.
Power Limit
5. Use the buttons and to select Power Limit.
To conrm your selection, press the button
ENT
.
V lock-in: 253.0V
P lock-out: 5%
P lock-in: 20%
Mode: ON
6. To change the mode, use the buttons and and press the button
ENT
.
To switch the function on, select ON and press the button
ENT
.
To switch the function off, select OFF and press the button
ENT
. When you switch the
function off, you can ignore the following steps.
Do not change this setting without prior
consultation with Delta Solar Support.