NetworX Version 3 Installation Manual
65
Configuring the system autotest
The autotest is run at configured intervals to ensure communication between the control panel and
central station or the control panel and up/download software is functioning correctly. The following
example sets the system autotest to run every Friday at 12.45, assuming that today is Wednesday.
1. Navigate with the ½¾ keys to Control
Panel>Communications>Autotest>Hours/Days?>Days and press OK.
2. Scroll to Interval>7 days and press OK.
3. The keypad beeps once to confirm the change and returns to Hours/Days?.
4. Scroll to Hour>12 and press OK.
5. The keypad beeps once to confirm the change and returns to Hour.
6. Scroll to Minutes>45 and press OK.
7. The keypad beeps once to confirm the change and returns to Minutes.
8. Scroll to Time Since Test>5 Days and press OK.
9. The keypad beeps once to confirm the change and returns to Time Since Test.
Enabling reporting
You must enable event reporting in the control panel and program the events and zone types for
which reports are sent. You must specify the format of the report and, in the case of voice reports,
you must map each event to a recorded message. You can map one message to a number of events.
The following example enables voice reporting to phone number 2 for a phone line cut event and
assigns a voice message to this event.
1. Navigate with the ½¾ keys to Control Panel>Communications>Central Station and
press OK.
2. Scroll to Phone Numbers>Phone Number 2>Protocol>Vocal and press OK.
3. The keypad beeps once to confirm the change and returns to Protocol.
4. Navigate with the ½¾ keys to Control Panel>Communications>Reporting>Report
Codes>Tamper/Fault and press OK.
5. Scroll to Phone Line Cut and press OK.
6. Type the number of the message that you want to map to that zone and press OK.
7. The keypad beeps once to confirm the change and returns to Phone Line Cut.