8-8 Section 8-3 - Covers - Replacement Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-3-3 Left Side eTower Cover Replacement Procedure
8-3-3-1 Tools
None
8-3-3-2 Time Required
5 min
8-3-3-3 Preparations
Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
8-3-3-4 Left Side eTower Cover Removal Procedure
1) Remove all accessories
2) Remove the RS Probe Cover.:
3) Grip the rubber holder and pull the cover toward you to remove it from the system.
Refer to Table 9-8 on page 9-7.
• Accessories - Replacement Procedures
• RS Probe Cover Removal Procedure
Figure 8-3 Removing the Left Side eTower Cover