8-10 Section 8-3 - Covers - Replacement Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-3-4 Right Side eTower Cover Replacement Procedure
8-3-4-1 Tools
None
8-3-4-2 Time Required
5 min
8-3-4-3 Preparations
Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
8-3-4-4 Right Side eTower Cover Removal Procedure
1) Remove all accessories.
2) The right side eTower cover removal procedure is identical to the left side eTower cover removal
procedure.:.
8-3-4-5 Right Side eTower Cover Installation Procedure
1) The right side eTower cover installation procedure is identical to the left side eTower cover
installation procedure.:
2) Install all accessories.
Refer to Table 9-8 on page 9-7.
• Accessories - Replacement Procedures
• Left Side eTower Cover Removal Procedure
• Left Side eTower Cover Installation Procedure
• Accessories - Replacement Procedures
Perform the checks listed in Right Side eTower Cover Replacement Procedure on page 8-216