10-6 Section 10-3 - Why Do Maintenance?
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
Section 10-5
System Maintenance
10-5-1 Preliminary Checks
The preliminary checks take approximately 15 minutes to perform. Refer to the Venue™ User Manual
whenever necessary.
Table 10-4 System Preliminary Checks
Step Item Description
1.
Ask & Listen Ask the customer if they have any problems or questions about the equipment.
2.
Paperwork Fill in the top of the EQC inspection form. Record all probes and Ultrasound system options.
3.
Power-up
• Turn the Ultrasound system power ON and verify that all fans and peripherals turn On.
• Watch the displays during power up to verify that no warning or error messages are
displayed.
• Where applicable, confirm that the battery is charged. If no AC Input present, use the
internal battery.
4.
Probes Verify that the Ultrasound system properly recognizes all probes.
5.
Displays Verify proper display on the Monitor and Touch Screen.
6.
Review Error Logs
Where applicable, Error Logs can be reviewed via system diagnostics.
7.
Presets Back-up all Customer Presets onto appropriate media.
8.
Image Archive
Back up the Image Archive onto appropriate media.