EasyManuals Logo
Home>GE>Medical Equipment>Venue R1

GE Venue R1 Service Manual

GE Venue R1
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #303 background imageLoading...
Page #303 background image
Chapter 8 - Replacement Procedures 8-83
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-6-3 Halo Handle Replacement Procedure
8-6-3-1 Tools
LOCTITE® 243™
Allen key 3 mm.
8-6-3-2 Time Required
30 min
8-6-3-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-6-3-4 Halo Handle Removal Procedure
1.) Remove all accessories.
2.) Remove cockpit (monitor).
3.) Remove the arm.
4.) Remove the Riser Thermal Cover.
5.) Remove the Riser Cover.
FRU Part #
Refer to Table 9-6 on page 9-5.
Accessories - Replacement Procedures
Cockpit (Monitor) Removal Procedure
Arm Removal Procedure
Riser Thermal Cover Removal Procedure
Riser Cover Removal Procedure

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Venue R1 and is the answer not in the manual?

GE Venue R1 Specifications

General IconGeneral
BrandGE
ModelVenue R1
CategoryMedical Equipment
LanguageEnglish

Related product manuals