EasyManuals Logo
Home>GE>Medical Equipment>Venue R1

GE Venue R1 Service Manual

GE Venue R1
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #359 background imageLoading...
Page #359 background image
Chapter 8 - Replacement Procedures 8-139
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-7-6 ON/OFF Switch Cable Replacement Procedure
8-7-6-1 Tools
Flat screwdriver.
8-7-6-2 Time Required
10 min
8-7-6-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-7-6-4 ON/OFF Switch Cable Removal Procedure
1.) Remove all accessories.
2.) Remove the following covers: Lower Front eTower, Left side eTower, and Right Side eTower,
3.) Remove the battery packs to gain access to the MPB module.
4.) Unscrew the two mounting screws and remove the MPB module.
FRU Part #
Refer to Table 9-14 on page 9-14.
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
Battery Module Removal Procedure
Figure 8-141 Accessing ON/OFF Switch Cable
ON/OFF Switch Cable

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Venue R1 and is the answer not in the manual?

GE Venue R1 Specifications

General IconGeneral
BrandGE
ModelVenue R1
CategoryMedical Equipment
LanguageEnglish

Related product manuals