Chapter 8 - Replacement Procedures 8-49
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
12.)Install all accessories.
13.)Turn ON power to the system.
• Left Side eTower Cover Installation Procedure
• Right Side eTower Cover Installation Procedure
• Lower Front eTower Cover Installation Procedure
• RS Probe Cover Installation Procedure
• Accessories - Replacement Procedures
Perform the checks listed in Back End (BE) Module Replacement Procedure on page 8-217