Chapter 8 - Replacement Procedures 8-79
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-6-1-5 MPB Front Metal Door Installation Procedure
1.) Install the new MPB Front Metal Cover and tighten the four captive screws.
2.) Refit the Lower Front eTower cover
3.) Install all accessories.
4.) Turn ON power to the system.
• Lower Front eTower Cover Removal Procedure
• Accessories - Replacement Procedures
Perform the checks listed in MPB Front Metal Door Replacement Procedure on page 8-217