Three: PE653 Receiving Device Installation 13
Providing a brighter solution.™
Section 3:
Installing and Wiring the PE653
Receiving Device
To avoid fire, shock, or death, turn off power at circuit breaker and test that power is off before wiring.•
Read instructions completely before installation and retain for future reference.•
Observe all national and local electrical and safety codes.•
Disconnect power when servicing or changing loads.•
Alterations or modifications to the device will void the warranty.•
For outdoor locations, rain-tight or wet location conduit hubs that comply with the requirements of UL 514B •
Conduit, Tubing, and Cable Fittings, must be used.
Ratings
Controller Power In:
120/240VAC, 50/60Hz - 5W MAX.•
Contact Ratings:
Load 1
120/240 VAC•
20A Resistive•
17 Full load A, 80 Lock Rotor A•
5A Tungsten or Ballast•
Loads 2-5
120/240 VAC•
15A Resistive•
10 Full load A, 60 Lock Rotor A•
5A Tungsten or Ballast•
•
Figure 3-1 (PE653 Receiving Device)
Include/Exclude Switch
120 / 240 VAC Selector Switch
Circuit ON/OFF Switches
Fuse
(250 VAC - 0.1 A)
Threaded Conduit
Connection Bushing and Hub
Antenna Section
Load ON indicator
(Green LEDs)
Low Voltage Divider
(removable)
Low Voltage Knockout
AC Power
Conduit opening
Wiring Terminals
AC Power & Status
indicator (Red)
Antenna Section
Locking Screws