EasyManuals Logo
Home>JUKI>Industrial Equipment>KE-2050

JUKI KE-2050 User Manual

JUKI KE-2050
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #282 background imageLoading...
Page #282 background image
KE-2050/2060 Maintenance Manual
16-1
DANGER
To prevent any trouble caused by accidental machine start, always
shut-down the power before starting the maintenance and
adjustment work.
[16] FEEDER POSITION INDICATOR
16-1. Detaching the FPI (Front) from the Machine Main Unit
As shown in the figure below, the FPI is hanged on the hook of the FPI side bracket fixed to the
Y-axis frame (both sides), and fixed with the SEMS cap bolts (M6 × 12).
To detach the FPI, remove two bolts and slide it upward.
FPI side bracket F
FPI assembly F
SEMS cap bolt
Rev. 2.00

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JUKI KE-2050 and is the answer not in the manual?

JUKI KE-2050 Specifications

General IconGeneral
BrandJUKI
ModelKE-2050
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals