E 9
1005.USA
2.2 t To prepare the truck for operation
– Attach the belt system
(see section “Attaching the safety restraint belt“ in this chapter).
– Close the safety gates securely on both sides.
– Turn the EMERGENCY DISCONNECT switch (5) to release it.
– Put the key in the key switch (3) and turn it clockwise.
– Test the warning device (horn) (4).
– Test the operating and parking brakes.
– Carry out a test movement on the lift mast to adjust the height display.
QwW Press the EMERGENCY DISCONNECT switch (5) immediately if the truck
starts to move or lift when it is switched on.
NOTICE Brief steering movements caused by steering referencing are permissible.
54
8
7
3
6
E 9
1005.USA
2.2 t To prepare the truck for operation
– Attach the belt system
(see section “Attaching the safety restraint belt“ in this chapter).
– Close the safety gates securely on both sides.
– Turn the EMERGENCY DISCONNECT switch (5) to release it.
– Put the key in the key switch (3) and turn it clockwise.
– Test the warning device (horn) (4).
– Test the operating and parking brakes.
– Carry out a test movement on the lift mast to adjust the height display.
QwW Press the EMERGENCY DISCONNECT switch (5) immediately if the truck
starts to move or lift when it is switched on.
NOTICE Brief steering movements caused by steering referencing are permissible.
54
8
7
3
6