EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #307 background imageLoading...
Page #307 background image
Driving modes and rigging for on-road driving
6.4 Rigging the main boom
Operating Instructions GMK5250L 3 302 633 en 6 - 25
27.09.2017
Fitting the
derricking cylinder
head axle
• Check to see if the tightening belt of the derricking cylinder is taken off.
Aligning the derricking cylinder
• (A) – Remove the bolt (1) and remove the
disc.
• Place the lifting device (2) underneath the
middle of the derricking cylinder.
• (B) – Carry out the Raise, movement until the
head pin (4) aligned with the bearing in the
derricking cylinder (3).
Fitting the head pin
• (A) – Turn the switch (1) to the Insert
position.
• (B) – Insert the lever into the clamp (2).
• Pump until the head pin (3) is inserted as far
as possible.
Securing the head pin
• (C) – Fasten the disc with the bolt (4).
• Stow away the lever and the lifting device so
that it is safe to drive on the road.
S
Risk of damage to the bearings in the derricking cylinder head
Make sure that the bearings in the derricking cylinder are aligned with the
head pin before fitting the head pin.
This prevents the head pin from damaging the bearing.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals