Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
Operating Instructions GMK5250L 3 302 633 en 14 - 55
27.09.2017
14.7.4 Establishing the hydraulic circuits required
You must switch over the necessary valves to establish a hydraulic circuit.
Switching over
valves
The valves 1 to 5 are labelled with their respective numbers.
For crane operation
• Switch the valves 1 to 5 downward.
s
G
Danger from mutual interference of the power units!
For crane operation, always switch all the valves 1 to 5 down. This prevents
the power units suddenly starting to move.