Rigging work
11.1 Rigging work checklists for crane operation with the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 5
27.09.2017
11.1.2 CHECKLIST: Unrigging
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
1. If required, remove the auxiliary hoist;
à CHECKLIST: Removing the
auxiliary hoist
, p. 6 - 57.
2. With the RCL set correspondingly, unrig the counterweight;
à CHECKLIST: Unrigging the counterweight, p. 11 - 75.
3. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à p. 10 - 32.
4. Retract main boom, lock telescopic sections and lock telescoping
cylinder with telescopic section
I for on-road driving; Ã Before on-road
driving
, p. 10 - 109.
s