Rigging work
11.1 Rigging work checklists for crane operation with the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 5
27.09.2017
11.1.2 CHECKLIST: Unrigging
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
1. If required, remove the auxiliary hoist;
à CHECKLIST: Removing the
auxiliary hoist
, p. 6 - 57.
2. With the RCL set correspondingly, unrig the counterweight;
à CHECKLIST: Unrigging the counterweight, p. 11 - 75.
3. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à p. 10 - 32.
4. Retract main boom, lock telescopic sections and lock telescoping
cylinder with telescopic section
I for on-road driving; à Before on-road
driving
, p. 10 - 109.
s

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals