Operating elements for crane operation
8.2 Brief description of the operating elements
8 - 138 3 302 633 en Operating Instructions GMK5250L
27.09.2017
RCL override –
version B
This point only applies to RCL programming deviating from EN 13000.
For RCL programming in accordance with EN 13000;
à p. 8 - 137.
Overriding the RCL in an emergency
No function
No function
1 – Press once:
RCL shutdown overridden – crane functions
enabled
– Crane functions can be started within the next
10 seconds.
– Speed of movements increasing load moment
max. 15%.
à RCL override – version B, p. 10 - 67