Crane operation
10.9 Heating and air-conditioning system
Operating Instructions GMK5250L 3 302 633 en 10 - 153
27.09.2017
Switching heating
start on/off
Switching on
• Select a storage location (e.g. #1) –
symbol (1) red. You can also selected
other storage locations.
The auxiliary heating now starts at the times
stored in the corresponding column.
Switching off
• Select a storage location (e.g. #1) –
symbol (1) grey. You can also selected
other storage locations.
• Change and confirm the respective values
using the controls (3) or (4).