5. Remove the clamp (1) (Figure 4-3).
6. Push the cable through the hole (3) (Figure 4-3) until the
cable wedge (4) slides out of the pouch (2).
7. Remove the cable wedge and place the cable away from
the crane.
Installing a New Cable
1. Tension the cable slightly while winding it onto the drum.
2. Place the reel stand (1) (Figure 4-4) with the new cable
in front of the main boom head.
3. Guide cable over the head sheave (2) (Figure 4-4) up to
the hoist drum.
4. Guide the cable through the hole (3) (Figure 4-5) until it
extends about 5.0 ft (1.5 m) beyond the pouch (2)
(Figure 4-5).
5. Feed the free end of the cable back through the pouch
(2) (Figure 4-5).
6. Secure the clamp (1) (Figure 4-5) and tighten it. Torque
to 58 lb-ft (79 Nm).
7. Place the cable wedge (4) (Figure 4-5) in the loop.
Item Description
1 Clamp
2 Pouch
3 Cable Hole
4 Cable Wedge
WARNING
Entanglement Hazard!
Keep all body parts and loose clothing clear while hoist is
running.
Death or serious injury may result if entanglement occurs
during hoist operations.
FIGURE 4-3
7592-4
1
4
2
1
3
4
2
7592-6
CAUTION
If cable is wound from the storage drum, the reel should
be rotated in the same direction as the hoist.
Damage to the wire rope may occur.