4-31
RT9150E OPERATOR MANUAL SET-UP AND INSTALLATION
Published 2-23-2017, Control # 644-00
16. Remove tag line from the 36 ft (11 m) extension and
secure to the front of the 23 ft (7 m) extension, routing
the line through the 36 ft (11 m) extension.
17. Have a helper hold the tag line taut or fasten it to the rear
of the 36 ft extension.
18. Ensure the boom is horizontal.
19. Remove the retaining clip (1) (Figure 4-41) from the pin
(2) and remove the pin. Secure the locking bar (3) to the
stowage lug (4) on the 36 ft (11 m) extension with the pin
and retainer clip.
20. Using the tag line (Figure 4-42) to maintain control,
swing the 23 ft (7 m) extension into the erected position.
NOTE: Do not lower boom until the 23 ft extension has
been completely swung in front of the 36 ft
extension.
21. Slightly lower the boom.
22. Remove retainer clips and pins (Figure 4-42) from
holder. Install pins (1) in connecting lugs and secure with
retainer clips (2).
WARNING
Crushing Hazard!
Always secure the 23 ft extension with a tag line before
releasing the connection between the two extensions.
This will prevent the 23 ft extension from swinging
uncontrolled, causing serious injury or death.
WARNING
Crushing Hazard!
To prevent serious injury or death, do not stand in the
swing arch of the extension.
Reference Only