3.80
9926814 R08 - 2015-2016 RZR 900 2016 RZR S 1000 Service
Manual
© Copyright Polaris Industries Inc.
11. Install the valve tappet
i
for each valve in the order
they were removed.
NOTE
Oil the tappet prior to installing.
If any valve train components were replaced, refer to
Valve Clearance Adjustment, page 3.87.
VALVE SEALING TEST
1. Clean and dry the combustion chamber area
q
.
2. Pour a small amount of clean solvent into each
intake port
w
and check for leakage around the
valves. The valve seats should hold fluid with no
seepage.
3. Repeat for exhaust valves by pouring fluid into each
exhaust port
e
.
ENGINE / COOLING SYSTEM