(3) Adaptor angle
(4) 2 mounting screws
Installation and Commissioning
²
Reinstall the plastic screw covers.
²
Refasten the terminal blocks and the necessary communication lines.
²
Connect the current and voltage blocks of the expansion module.
²
Connect any available plug-in modules.
²
Use the supplied grounding cable to connect the expansion module with the device and reconnect the
device to service ground.
²
Extend the device configuration in DIGSI and load this configuration to the device.
²
Resume operation of the device.
Surface-Mounted Devices with Integrated On-Site Operation Panel
Basic Rules for Expansion
NOTE
Prepare the following tools for the device expansion:
•
Phillips screwdriver size PZ1 and PZ2
•
Screwdriver DIN 4 x 0.8
•
During assembly, use the prescribed torques (see chapter 6.13 Design Data).
Comply with the following basic rules when expanding devices:
•
Always fit the base module on the right in the 1st device row.
•
Always fit the expansion modules from right to left.
•
Always fit the on-site operation panel of the base module on the left.
•
Always fit the on-site operation panels of the expansion modules from left to right.
•
Always fit the on-site operation panel of the expansion module with the key switches in the 1st place
next to the on-site operation panel of the base module.
•
Always fit the on-site operation panels without LEDs last.
•
Join the on-site operation panels to one another with 2 mounting brackets.
•
Always install a power-supply module PS203 on the right as the first unit in the 2nd device row.
•
Note that the PS203 must always have the same rated voltage as the base module.
•
In the 2nd device row, you do not need any on-site operation panels, mounting brackets, or distance
frames.
NOTE
When expanding a device in the 1st device row, order 2 mounting brackets that match the width of the
expanded device.
5.2.2
5.2.2.1
Working on the Device
5.2 Expanding Modular Devices
160 SIPROTEC 5, Hardware Description, Manual
C53000-G5040-C002-C, Edition 10.2017