9.2.3 Routine Maintenance
Item Method Period
Device clean
Check the temperature and dust of the
inverter. Clean the inverter enclosure if
necessary.
Six months to a year
(depending on the dust con-
tents in air)
Electrical
connection
Check whether all cable are firmly con-
nected in place.
Check whether there is damage to the
cables, especially the surface in con-
tact with metal.
6 months after commissioning
and then once or twice a year
General status
of the system
Visual check for any damage or de-
formation of the inverter.
Check any abnormal noise during
the operation.
Check each operation parameter.
Be sure that nothing covers the
heat sink of the inverter.
Every 6 months
User Manual 9 Troubleshooting and Maintenance

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG10RS and is the answer not in the manual?

Sungrow SG10RS Specifications

General IconGeneral
Rated Power10 kW
Max. DC Voltage1100 V
Number of MPPTs2
Max. Efficiency98.6%
Protection RatingIP65
Start Voltage180 V
Rated AC Output Power10 kW
Max. AC Output Power11 kW
Rated Output Voltage230 V
Operating Temperature Range-25°C to 60°C
TopologyTransformerless
Cooling MethodNatural Convection
Maximum Power Output11 kW
Maximum Input Current25 A
MPPT Voltage Range160-1000 V
Max. DC Input Power15 kW
AC Voltage Range180-280 V
Humidity Range0-100%
CommunicationRS485

Related product manuals