67
Please check the country supported by this product at http:// support.sungrow-
power.com/.
Set Country/Region to the country/region where the inverter is installed. Oth-
erwise, the inverter may report a fault.
step 10 After a plant is successfully created, return to the App home page to view the plant
information.
- - End
6.5 Initializing the Device
The inverter is successfully connected to the router.
If there is no latest equipment upgrade package, skip steps 1 and 2.
The actual initializing procedure may differ due to different countries. Please follow the ac-
tual App guidance.
step 1 If a latest equipment upgrade package is available, the following prompt window pops up.
Tap UPDATE NOW to download the latest update package.
figure 6-3 Upgrade Reminder
step 2 After download, it would take around 15 minutes to update. After successful upgrade, the
screen will show the version numbers before and after the upgrade as well as the upgrade
time. Tap NEXT.
User Manual 6 Commissioning

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG10RS and is the answer not in the manual?

Sungrow SG10RS Specifications

General IconGeneral
Rated Power10 kW
Max. DC Voltage1100 V
Number of MPPTs2
Max. Efficiency98.6%
Protection RatingIP65
Start Voltage180 V
Rated AC Output Power10 kW
Max. AC Output Power11 kW
Rated Output Voltage230 V
Operating Temperature Range-25°C to 60°C
TopologyTransformerless
Cooling MethodNatural Convection
Maximum Power Output11 kW
Maximum Input Current25 A
MPPT Voltage Range160-1000 V
Max. DC Input Power15 kW
AC Voltage Range180-280 V
Humidity Range0-100%
CommunicationRS485