EasyManuals Logo
Home>Tait>Accessories>TB9300

Tait TB9300 User Manual

Tait TB9300
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #120 background imageLoading...
Page #120 background image
120 Replacing Modules TB9300 Installation and Operation Manual
© Tait International Limited April 2024
Refitting 1. Bottom Guide Rails
a. With the locating hooks pointing towards the rear of the subrack,
insert the hooks into the slots in the subrack.
b. Push the guide rail towards the rear of the subrack until you hear
the locking tab “click” into place.
2.
Top Guide Rails
a. With the locating hooks pointing towards the front of the subrack,
insert the hooks into the slots in the subrack.
b. Push the guide rail towards the front of the subrack until you hear
the locking tab “click” into place.
8.7 Replacing the Subrack Interconnect Board
Removal 1. If you have not already done so, carry out the instructions in “Pre-
liminary Disassembly” on page 114.
2. Disconnect any system control bus cables and DC power cables
from the subrack board.
3. Remove the three M3 nuts and spring washers
b securing the right
end of the board to the subrack.
4. Remove the D-range cover
c.
5. Remove the two retaining clamps
d securing the left end and centre
of the board.
6. Remove the board.
Refitting 1. If previously removed, replace the insulator e.
2. Refit the board and D-range cover, and secure with the M3 nuts and
spring washers. Replace the two retaining clamps.
3. Reconnect the system control bus cables and reciter DC cables as
shown in “Appendix B Inter-Module Connections” on page 125.

Table of Contents

Other manuals for Tait TB9300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB9300 and is the answer not in the manual?

Tait TB9300 Specifications

General IconGeneral
BrandTait
ModelTB9300
CategoryAccessories
LanguageEnglish

Related product manuals