EasyManuals Logo
Home>Tait>Accessories>TB9300

Tait TB9300 User Manual

Tait TB9300
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
58 Installation TB9300 Installation and Operation Manual
© Tait International Limited April 2024
4.2 Unpacking and Moving the Subrack
The subrack is packed in a strong corrugated cardboard carton with top and
bottom foam cushions. To prevent personal injury and damage to the
equipment, we recommend that two people unpack and move the subrack.
To remove the subrack from the carton, follow the procedure illustrated in
Figure 4.2.
Caution A subrack complete with modules can weigh up to 62lb
(28kg), or up to 66lb (30kg) complete with packaging. We recommend
that you have another person help you unpack and move the equipment.
The TBAA03-16 carrying handles will make it easier to move the
equipment once it has been unpacked. If necessary, remove the modules
from the subrack before moving it (refer to “Replacing Modules” on
page 113). In all cases follow safe lifting practices.
1. Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides
b.
2. Rotate the carton carefully onto its side
c and then onto its top d,
ensuring that none of the flaps is trapped underneath.
Figure 4.2 Unpacking the subrack
b
e
g
f
hi
cd

Table of Contents

Other manuals for Tait TB9300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB9300 and is the answer not in the manual?

Tait TB9300 Specifications

General IconGeneral
BrandTait
ModelTB9300
CategoryAccessories
LanguageEnglish

Related product manuals