Unit Operation with TG-VI Controller
50
Starting the Unit with a Unit Self
Check Test
This procedure is used for a complete check of the trailer, unit,
and unit control circuits. It should be used when first starting
the unit for a trip before the cargo is loaded.
1. Perform a Pretrip Inspection. See the manual Pretrip
Inspection in the previous chapter.
2. This procedure is automatic and can be performed on the
way to the loading area or while waiting to load.
3. Place the On/Off switch in the On position.
4. Clear any alarms.
5. Press and hold the TK key for at least 3 seconds. USC
(Unit Self Check) will appear on the display.
6. Press the E
NTER key while USC is displayed.
7. Lod (load) will appear on the display and the Unit Self
Check will start.
1. TK Logo Key
2. Enter Key
Figure 21: Unit Self Check
AMA61
1
2
Unit Operation with TG-VI Controller
50
Starting the Unit with a Unit Self
Check Test
This procedure is used for a complete check of the trailer, unit,
and unit control circuits. It should be used when first starting
the unit for a trip before the cargo is loaded.
1. Perform a Pretrip Inspection. See the manual Pretrip
Inspection in the previous chapter.
2. This procedure is automatic and can be performed on the
way to the loading area or while waiting to load.
3. Place the On/Off switch in the On position.
4. Clear any alarms.
5. Press and hold the TK key for at least 3 seconds. USC
(Unit Self Check) will appear on the display.
6. Press the E
NTER key while USC is displayed.
7. Lod (load) will appear on the display and the Unit Self
Check will start.
1. TK Logo Key
2. Enter Key
Figure 21: Unit Self Check
AMA61
1
2