D
IRECTION 5141177-100, REVISION 14 BRIGHTSPEED ELITE, EDGE, EXCEL: PRE-INSTALLATION
Chapter 1 - Introduction Page 29
1 – Intoduction
2.2 Purchaser Site Preparation Work
This list below will describe many of the items to consider when planning for a system replacement
or designing a room for new equipment
Determine room dimensions and verify that doorways are large enough for the scanner system.
Install appropriate conduits and duct work for system cables. If additional components are
required in the CT suite, their connection consideration must be determined and completed.
Install junction boxes of correct size with covers at locations shown in installation plan.
A1 main disconnect installation
Install power supply of correct voltage output and adequate KVA rating.
Install local disconnects, including proper over-current protection.
Install “steelwork” or other suitable support work for mounting equipment on walls or from
ceiling.
Camera should be on-site at the time of installation.
Complete all suite and room alterations and modifications.
Verify that room shielding is adequate for the system being installed
Review structural requirement - including floor vibration, levelness, and thickness
Review HVAC requirements including system regulation and patient comfort.
Review operational clearances to see if your daily used items fit, such as beds and carts.
Emergency medical equipment should also be considered
Storage cabinets and sink (if required) must be shown on the site print
These contractors and others may be required to help confirm that the site meet all installation
requirements:
- Structural Engineer and /or Architect
- HVAC contractor
- Electrical contractor
- Qualified radiological health physicist
The above items can be found in chapter 2 through 9 in this manual.
It is suggested that this work be completed at least three days prior to delivery
2.3 Manufacturer’s System Level Siting Requirements
These siting requirements are the minimum that must be met in order to install a new or replacement
system.
Network Communication in place and active
Meets all scan room regulatory and service requirements
Meets all minimum scan room structural requirements
Meets minimum scan room HVAC requirements
Meets minimum scan room electrical requirements
Reviewed radiation protection section in the Pre-Installation manual
All in room items shown on the final GE Healthcare site print and the final print is on site
No construction in the scan room or neighboring suite areas
It is suggested that this work be completed at least three days prior to delivery

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE BrightSpeed Elite and is the answer not in the manual?

GE BrightSpeed Elite Specifications

General IconGeneral
BrandGE
ModelBrightSpeed Elite
CategoryMedical Equipment
LanguageEnglish

Related product manuals