EasyManuals Logo

Komatsu PC210 User Manual

Komatsu PC210
266 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #102 background imageLoading...
Page #102 background image
2-58
PC210/240-ENG
12.4 MOVING MACHINE OFF
12.4.1 MOVING MACHINE FORWARD
WARNING
Before operating the travel levers, check the direction of the
track frame. If the sprocket is at front, the operation of the
track levers is reversed.
When moving off, check that the area around the machine is
safe, and sound the horn before moving.
Clear all personnel from the machine and the area.
Clear all obstacles from the path of the machine.
If the lever is moved inside the deceleration range, engine
speed will rise suddenly. Operate the levers carefully.
1. Set swing lock switch a to the ON (actuated) position and confirm
that swing lock monitor lamp b lights up.
2. Turn fuel control dial c towards the full speed position to increase
the engine speed.
3. Set safety lock lever d in the FREE position, fold the work equip-
ment, and raise it 40 - 50 cm (16 to 20 in) from the ground.
12. OPERATION
G/O F/O L/O B/O

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC210 and is the answer not in the manual?

Komatsu PC210 Specifications

General IconGeneral
Bucket Capacity0.8 - 1.2 m³
Travel Speed5.5 km/h
Max Digging Depth6, 620 mm
Max Reach9, 850 mm
Fuel Tank Capacity400 l
Engine ModelKomatsu SAA6D107E-1

Related product manuals