EasyManua.ls Logo

Komatsu PC210 - 23. MAINTENANCE SCHEDULE CHART; 23.1 MAINTENANCE SCHEDULE CHART

Komatsu PC210
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-22
PC210/240-ENG
23.1 MAINTENANCE SCHEDULE CHART
SERVICE ITEM PAGE
INITIAL 250 HOURS SERVICE (only after the first 250 hours)
Replace fuel filter cartridge 3-25
WHEN REQUIRED
Check, clean and replace air cleaner element 3-26
Clean inside of cooling system 3-28
Check and tighten track shoe bolts 3-32
Check and adjust track tension 3-33
Check electrical intake air heater 3-35
Replace bucket side cutters 3-36
Replace bucket teeth 3-37
Adjust bucket clearance 3-39
Check window washer fluid level, add fluid 3-40
Check and adjust air conditioner (Option) 3-41
Replace additional breaker filter element (option) 3-40
CHECK BEFORE STARTING
Check coolant level, add water 3-42
Check oil level in engine oil pan, add oil 3-42
Check fuel level, add fuel 3-43
Check oil level in hydraulic tank, add oil 3-44
Check air cleaner for clogging 3-45
Check electric wirings 3-45
Check for water and sediment in water separator, drain water 3-46
Check for water in primary fuel filter, drain water 3-46
EVERY 100 HOURS SERVICE
Lubricating 3-47
• Boom cylinder foot pin (2 points) 3-47
23. MAINTENANCE SCHEDULE CHART

Table of Contents

Related product manuals