3-65
PC210/240-ENG
24.8 EVERY 2000 HOURS SERVICE
Maintenance for every 100, 250, 500 and 1000 hours should be
carried out at the same time.
24.8.1 CHANGE OIL IN FINAL DRIVE CASE
The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out maintenance.
If there is still pressure remaining inside the case, the oil or
plug may fly out.
Loosen the plug slowly to release the pressure.
Prepare the following.
Container to catch drained oil: Min. 4.2 l capacity
Refill capacity: 4.2 l (1.11 US gal, 0,92 UK gal)
Handle
1. Set the TOP mark at the top, with the TOP mark and plug P perpen-
dicular to the ground surface.
2. Set a container under plug P to catch the oil.
3. Remove plug P and F with the handle and drain the oil.
REMARK
Check the O-rings in the plugs for damage. If necessary, replace with
new ones.
4. Screw in plug P.
5. Add engine oil through the hole of plug F.
For details of the oil to use, see 20. “USE OF FUEL, COOLANT AND
LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE”.
6. When the oil overflows from the hole of plug F, install plug F.
Tightening torque of plugs P and F: 70 ± 10Nm (7 ± 1 kgm, 50 ± 7
Ibft).
WARNING
24. SERVICE PROCEDURE

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC210 and is the answer not in the manual?

Komatsu PC210 Specifications

General IconGeneral
Bucket Capacity0.8 - 1.2 m³
Travel Speed5.5 km/h
Max Digging Depth6, 620 mm
Max Reach9, 850 mm
Fuel Tank Capacity400 l
Engine ModelKomatsu SAA6D107E-1