Crane operation
10.4 Operation of the rated capacity limiter
Operating Instructions GMK5250L 3 302 633 en 10 - 65
27.09.2017
To raise the boom You can release the raise boom function for derricking again within the
permitted working range.
H
This function is only active if the current degree of utilisation lies above
100% and the crane movements are switched off.
Raise main boom
• Press the button (1) once – the information
message (2) is displayed.
– Raising is enabled.
– The speed will then be reduced to 50%.
• Raise the main boom until the degree of
utilisation is less than 100%.
– The crane movements will then be
enabled again.
– The button (1) has no function.
H
The raising of the main boom will be shut down if the main boom angle is
too great. Then all you can do is set the load down.
Switch off function
– For degree of utilisation above 100%
The function will be switched off if you:
– press button (1) again, or
– switch off the ignition.
– For degree of utilisation below 100%
The function is switched off automatically.
s

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals