SET-UP AND INSTALLATION MLC650 VPC-MAXâ„¢ OPERATOR MANUAL
4-62
Published 04-06-18, Control # 231-14
Connecting the First Insert and Mast Butt Straps
See Figure 4-56 for the following procedure.
1. Remove the hair pin cotters (1) from the VPC-MAX
beam strap (2) retaining pin (3).
2. Rotate the retaining pin brackets (4) from the stored
position to the working position.
3. Install the retaining pin and hair pin cotters to the
brackets in the working position.
4. Remove the cotter pins (5) from the VPC-MAX beam
link (6) retaining pin (7).
5. Remove the retaining pin from the stored position and
install the pin in the working position.
6. Install the cotter pins to the retaining pin.
7. Connect the links to the strap. See "Connecting the Mast
Straps" on page 4-57 and "Connecting the Mast Straps
and Links with Clevis Pins" on page 4-58.
8. Repeat this process for the other side of the mast butt
and insert.
FIGURE 4-56
STORED POSITION
WORKING POSITION
Item Description
1 Hair Pin Cotter (qty 4)
2
VPC-MAX
Beam Strap (qty 2)
3 Retaining Pin (qty 2)
4 Retaining Pin Bracket (qty 4)
5 Cotter Pin (qty 4)
6
VPC-MAX
Beam Link (qty 4)
7 Retaining Pin (qty 2)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc VPC-MAX MLC650 and is the answer not in the manual?

Manitowoc VPC-MAX MLC650 Specifications

General IconGeneral
BrandManitowoc
ModelVPC-MAX MLC650
CategoryConstruction Equipment
LanguageEnglish

Related product manuals