-
-
'15 • HM-T-246
(10) Connection to existing cylinder
supply load.
add a cylinder that can produce the thermal boundary layer.
-
-
⇔
Clean water and return
New
cylinder
Tht-460%
70%
100%
40%
Tht-1
10%
Tht-5
30%
Tht-2
Tht-6
Tht-3
Existing
cylinder
www.ampair.co.uk | sales@ampair.co.uk