EasyManuals Logo

Mitsubishi Heavy Industries ESA30E-25 User Manual

Mitsubishi Heavy Industries ESA30E-25
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #204 background imageLoading...
Page #204 background image
-
203
-
'15 • HM-T-246
White
Red
Blue
Front
4) Connecting the power cable to the compressor
5) Attaching terminal cover and bundling the wires
Hook the back of terminal cover to the latch and tighten 2
screws.
The unbound wires shall be put back the way they were.
(g) Test run
1) Check whether the controls and sensors are normal.
(f) Charging refrigerant
1) Air tightness test should be done with N
2
gas by pressurizing up to 14MP a
2) E vacuate the refrigerant pipes
3) Charge CO
2
refrigerant * About 2 sets of 7m
3
bomb are required.
AMP Air Conditioning
www.ampair.co.uk | sales@ampair.co.uk

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi Heavy Industries ESA30E-25 and is the answer not in the manual?

Mitsubishi Heavy Industries ESA30E-25 Specifications

General IconGeneral
BrandMitsubishi Heavy Industries
ModelESA30E-25
CategoryHeat Pump
LanguageEnglish

Related product manuals