EasyManuals Logo
Home>Tektronix>Test Equipment>TDS3000 Series

Tektronix TDS3000 Series User Manual

Tektronix TDS3000 Series
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #197 background imageLoading...
Page #197 background image
Appendix E: Performance Verification
TDS3000 Series User Manual
E–5
Performance Verification Procedures
Before beginning these procedures, two conditions must first be met:
The oscilloscope must have been operating continuously for ten
minutes in an environment the meets the operating range
specifications for temperature and humidity.
You must perform the Compensate Signal Path operation
described on page 1–4. If the operating temperature changes by
more than 10° C, you must perform the Compensate Signal Path
operation again.
The time required to complete the entire procedure is approximately
one hour.
WARNING. Some procedures use hazardous voltages. To prevent
electrical shock, always set voltage source outputs to 0 V before
making or changing any interconnections.

Table of Contents

Other manuals for Tektronix TDS3000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix TDS3000 Series and is the answer not in the manual?

Tektronix TDS3000 Series Specifications

General IconGeneral
BrandTektronix
ModelTDS3000 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals