Appendix E: Performance Verification
TDS3000 Series User Manual
E–5
Performance Verification Procedures
Before beginning these procedures, two conditions must first be met:
The oscilloscope must have been operating continuously for ten
minutes in an environment the meets the operating range
specifications for temperature and humidity.
You must perform the Compensate Signal Path operation
described on page 1–4. If the operating temperature changes by
more than 10° C, you must perform the Compensate Signal Path
operation again.
The time required to complete the entire procedure is approximately
one hour.
WARNING. Some procedures use hazardous voltages. To prevent
electrical shock, always set voltage source outputs to 0 V before
making or changing any interconnections.