Appendix 5 General debug steps
1. the motor wihout load, test run
(1) connect the cable, please note that U, V, W, PE must connect one to one, cannot crossed.
(2) open loop test run: check the power supply cable and encoder feedback, make sure the connection is
normal. Do as the below steps to run the motor forward or reverse, if the motor shaft vibrate or alarm,
please cut off the power at once, check the wiring.