EasyManuals Logo
Home>Doosan>Engine>GC25P-3

Doosan GC25P-3 User Manual

Doosan GC25P-3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #122 background imageLoading...
Page #122 background image
- 121 -
Engine Flywheel Removal
IMPORTANT: Note the position and direction of the
engine flywheel before removal. The engine flywheel
must be reinstalled to the original position and
direction.
1. Remove the engine flywheel bolts.
2. Remove the engine flywheel.
Distributor Removal
1. Disconnect the secondary ignition wires (1) from the
spark plugs and the ignition coil.
2. Disconnect the primary ignition harness (4) from the
ignition coil. Do not remove the wires from the
distributor unless it is necessary.
3. Remove the distributor hold down bolt (6).
4. Remove the distributor (2) and gasket (3).
VE010-3L
VE009-3L
LP Engine G430(3.0L) Base Engine Service Procedure

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan GC25P-3 and is the answer not in the manual?

Doosan GC25P-3 Specifications

General IconGeneral
BrandDoosan
ModelGC25P-3
CategoryEngine
LanguageEnglish

Related product manuals