EasyManuals Logo
Home>Doosan>Engine>GC25P-3

Doosan GC25P-3 User Manual

Doosan GC25P-3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #172 background imageLoading...
Page #172 background image
- 171 -
LP Engine G430(3.0L) Base Engine Service Procedure
Valve Lifter Installation
1. Coat the bottom of the valve lifters with prelube, GM
P/N 1052365 or equivalent.
2. If reusing the valve lifters, install in their original
location.
3. Install the valve lifters.
Valve Rocker Arm and Pushrod
Installation
IMPORTANT: Be sure to keep parts in order. Parts
must be installed from where they were removed.
1. Install the valve pushrods. Be sure that the valve
pushrods seat in the valve lifter sockets.
2. Install the following components:
(1) The valve rocker arms (3).
(2) The valve rocker arm balls (2).
(3) The valve rocker arm nuts (1).
VE021-3L
VE023-3L
VE116-3L

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan GC25P-3 and is the answer not in the manual?

Doosan GC25P-3 Specifications

General IconGeneral
BrandDoosan
ModelGC25P-3
CategoryEngine
LanguageEnglish

Related product manuals