EasyManuals Logo
Home>Doosan>Engine>GC25P-3

Doosan GC25P-3 User Manual

Doosan GC25P-3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #168 background imageLoading...
Page #168 background image
- 167 -
LP Engine G430(3.0L) Base Engine Service Procedure
8. Install the connecting rod cap and nuts.
Tighten
Tighten the nuts evenly to 61 N•m (45 lb•ft).
9. When all of the connecting rod bearings are
installed, tap each connecting rod assembly lightly
parallel to the crankpin in order to make sure that
they have clearance.
10. Use a feeler gauge or a dial indicator in order to
measure the side clearance between the
connecting rod caps. Refer to Engine Mechanical
Specifications.
Timing Gear Oil Nozzle Installation
1. Drive the new nozzle in place (oil hole facing up)
with a suitable light plastic or rubber hammer.
Crankshaft Sprocket Installation
Tools Required
• J 5590 Crankshaft Sprocket Installer
1. Install the keys into the crankshaft keyways.
2. Use the J 5590 in order to install the crankshaft
sprocket.
VE0107-3L
VE127-3L
VE106-3L
VE037-3L

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan GC25P-3 and is the answer not in the manual?

Doosan GC25P-3 Specifications

General IconGeneral
BrandDoosan
ModelGC25P-3
CategoryEngine
LanguageEnglish

Related product manuals