- 80 -
LP Engine G430(3.0L) LP Fuel System
Assemble LP Gas Carburetor
1. Check all parts for damage. Replace damaged
parts with new as necessary.
2. Make sure all parts are clean and free of dirt and
foreign material.
3. Put throttle shaft (17) in position in the throttle body,
and install stop lever (16).
4. Put throttle plate (15) in position and install the two
screws.
5. Assemble in reverse order of disassembly.
NOTE : Air valve diaphragm assembly must be
oriented with position mark pointing toward LPG
6. See “Testing & Adjusting” for proper test and adjust
procedures.
End By:
a. Install LP Gas Carburetor.
LP Gas Fuelock
Remove & Install LP Gas Fuelock
1. Disconnect fuel lines (1).
2. Disconnect wire (2).
3. Remove fuelock (3).
NOTE: For the installation of the LP gas fuelock,
reverse the removal steps.
Apply loctite PST or equivalent to fuelock pipe threads
before installation.
16
15
14
17
2
3
1
P0002929
P0002926

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan GC25P-3 and is the answer not in the manual?

Doosan GC25P-3 Specifications

General IconGeneral
BrandDoosan
ModelGC25P-3
CategoryEngine
LanguageEnglish

Related product manuals