GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
4-4 Section 4-3 - General Procedure
4-3-2-1 TMST Power Down (cont’d)
4.) The shutdown process takes 15 seconds and the power off sequence is complete when the power
status LED is turned Amber.
5.) Disconnect the probes.Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
4-3-2-2 Scanner Shutdown
Disconnect the Mains Power Cable is necessary. For example: Relocating the scanner.
4-3-2-3 Full Maintenance Reboot (LOGIQ P3)
Full Maintenance Reboot will fully restart the whole system for performance improvement.
1.) Press the Power On/Off switch at the front of the system once.
2.) Click “Shutdown”.
3.) Full Maintenance Reboot dialog is displayed.
4.) During Full Maintenance the pop up window will two options “Ok” and “Cancel” press cancel for
Normal shutdown (Hibernate) and Ok for Shutdown.
DO NOT unplug and/or transport the unit until after the power off sequence has been completed.
Failure to do so may result in corrupted patient files.
Figure 4-3 “Full Maintenance Reboot” dialog