GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
Chapter 3 Installation 3-1
Chapter 3
Installation
Section 3-1
Overview
3-1-1 Purpose of Chapter 3
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
3-1-2 Average Installation Time
The LOGIQ P3 installation and functional checkout will take approximately Four hour. LOGIQ P3
consoles with optional equipment may take slightly longer.
Table 3-1 Contents in Chapter 3
Section Description Page Number
3-1
Overview
3-1
3-2
Receiving and Unpacking the Equipment
3-3
3-3
Packing the Equipment
3-8
3-4
Preparing for Installation
3-9
3-5
Completing the Installation
3-10
3-6
System Configuration
3-15
3-6-7
Software/Option Configuration
3-27
3-7
Connectivity Installation Worksheet
3-28
3-8
Loading Base Image Software
3-29
3-9
Software Version check out
3-30
3-10
Paperwork
3-31
Table 3-2 Average Installation Time
Description Average Installation Time Comments
Unpacking the scanner
Approximately 0.5 hour
Scanner /options
Approximately 0.5 hour
Dependent on the configuration that is required
DICOM Option
30 minutes
Dependent on the amount of configuration