8-80 Section 8-7 - Power Block - LOGIQ P3
4) Pull out the transformer tray assembly from the system. Refer Figure 8-84 on page 8-77
Figure 8-87 Removing Tansformer Assembly
8-7-3-5 Mounting procedure
Install the transformer assy in the reverse order of removal.
8-7-3-6 Functional Checkout Procedure
See
Section
Functional and/or
Leakage Current Test Debrief Script
4-3-1 Power On/Boot Up
Service Manual Direction 5308917-100, Section 8-8-1. Leakage Current measured at
{---------------}. Equipment passes all required tests and is ready for use..
4-3-2 Power Off/ Shutdown
10-7-5
Chassis Leakage