EasyManuals Logo
Home>Lenze>Control Unit>ECSxK001 series

Lenze ECSxK001 series User Manual

Lenze ECSxK001 series
483 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #102 background imageLoading...
Page #102 background image
Commissioning
Before you start
6
102
EDBCSXA064 EN 3.2
6 Commissioning
6.1 Before you start
Note!
ƒ The use of a Lenze motor is assumed in this description of the
commissioning steps. For details on the operation with other motors see
132.
ƒ The description is based on operation with the Lenze programs "Drive PLC
Developer Studio" (DDS) and "Global Drive Control" (GDC). The parameters
are displayed in online mode, i.e. GDC can directly access the codes of the
axis module.
Prior to initial switch−on of the drive system, check the wiring for completeness,
short−circuit, and earth fault:
ƒ Power connection:
Polarity of the DC−bus voltage supply via terminals +UG, −UG
ƒ Motor connection:
In−phase connection to the motor (direction of rotation)
ƒ Wiring of safe torque off" (formerly "safe standstill")
ƒ Feedback system
ƒ Control terminals:
Wiring adjusted to the signal assignment of the control terminals.

Table of Contents

Other manuals for Lenze ECSxK001 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze ECSxK001 series and is the answer not in the manual?

Lenze ECSxK001 series Specifications

General IconGeneral
BrandLenze
ModelECSxK001 series
CategoryControl Unit
LanguageEnglish

Related product manuals