Driving modes
6.4 Rigging the auxiliary hoist
6 - 18 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
6.4.2 CHECKLIST: Installing the auxiliary hoist
– The superstructure is slewed to the front.
– The main boom is resting in the boom rest.
1. Attach the auxiliary hoist at the centre of gravity and remove the bolts
from the connection points;
à p. 6 - 17.
2. Lift the auxiliary hoist on to the turntable and make the connections;
à p. 6 - 20.
3. – Make the hydraulic connections;
à p. 6 - 21.
– Make the electrical connection;
à p. 6 - 22.
– Establish the connection to the central lubrication;
à p. 6 - 23
4. – Check that the auxiliary hoist is functioning properly;
à p. 6 - 25.
– Place the hoist rope on and reeve it.
5. – Fit the hoist rope, using the rigging aid if necessary;
à p. 6 - 26.
– Reeve the hoist rope;
à p. 12 - 108.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK4100L-1 and is the answer not in the manual?

Manitowoc Grove GMK4100L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK4100L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals