EasyManuals Logo
Home>Suzuki>Motorcycle>VZR1800 2007

Suzuki VZR1800 2007 User Manual

Suzuki VZR1800 2007
609 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #324 background imageLoading...
Page #324 background image
FUEL SYSTEM AND THROTTLE BODY 6-23
FUEL INJECTOR INSTALLATION
• Apply thin coat of the engine oil to new injector cushion seals
and O-rings. (!6-20)
• Install the injector by pushing it straight to the throttle body.
Never turn the injector while pushing it. (! 6-20)
THROTTLE VALVE SYNCHRONIZATION
Check and adjust the throttle valve synchronization among two
cylinders.
Step 1
• Remove the fuel tank. (!6-3)
• Remove the ISC valve. (!6-18)
• Connect the ISC valve coupler 1 and hoses 2.
• Connect the special tool (Mode select switch) to the dealer
mode coupler. (!5-18)
• Disconnect the vacuum hoses 3 from each throttle body.
• Connect the vacuum tester hoses 4 to each vacuum nipple
on the throttle body.
#1 #2
#1 #2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki VZR1800 2007 and is the answer not in the manual?

Suzuki VZR1800 2007 Specifications

General IconGeneral
BrandSuzuki
ModelVZR1800 2007
CategoryMotorcycle
LanguageEnglish

Related product manuals